Project Description
During the construction the following works were performed:
- Construction of railway tracks (1145 m)
- Installation of turnouts (3 pcs.)
- Construction of subgrade
- Construction of drainage system
- Installation of point lighting system
Customer: Baltic Container Terminal Ltd.