×


Scroll down

Construction of Bolderaja-2 Station with Connecting Track to Terminals on Krievu Island

Project completed: December 2015

Project Description

Construction of Bolderaja-2 Station with Connecting Track to Terminals on Krievu Island Project (2010-2015), co-financed by EU Cohesion Fund, provided for the construction of railway connection with the Riga Freeport territory on Krievu Island – connecting railway track, Bolderaja – 2 railway station with nine station tracks, railway bridges and building of interlocking tower with the objective of relocation of railway cargo unloading operations to the left bank of the Daugava river.

 

Within the range of the Project the following works were performed:

  • Construction of railway tracks (10 550 m)
  • Installation of turnouts (11 pcs.)
  • Construction of subgrade
  • Construction of cable canalization
  • Laying of electric, telecommunications, signaling cable networks
  • Installation of video surveillance system
  • Installation of fire detection system and alarm system
  • Erection of radio mast, 28 m height
  • Reconstruction of gas pipeline and sewerage systems

Customers: Rail Balt Ltd., BMGS JSC

10 550 m

railway tracks

11 pcs.

turnouts

Related projects

December 2018

Railway Construction for STREK Ltd. Terminal on the Territory of Riga Free Port, Krievu Island

Learn more

October 2018

The 2-nd Stage of Development of Liepaja Port Railway Infrastructure

Learn more

October 2018

Construction of Optic Cable Line in Riga - Skulte Section

Learn more
Load
more