Construction of Catenary System in Skriveri – Muldakmens Section (5,4 km)

Project completed: December 2014

Project Description

The Electrification of Second Main Track in Skriveri - Aizkraukle Section Project provided for the construction of a new electrified section, 5,4 km long, from Skriveri station to Muldakmens flag station and its connection to the existing railroad catenary system.

 

Within the range of the Project the following works were performed:

  • Dismantling of catenary supports and cantilevers
  • Installation of catenary suspension
  • Installation of catenary system earthing
  • Installation of catenary system insulators
  • Installation of contact wires

Customer: BMGS JSC

5,4 km

new electrified section

Related projects

May 2019

Construction of Pedestrian Tunnel on Ogre Railway Station: Special Works

Learn more

December 2018

Railway Construction for STREK Ltd. Terminal on the Territory of Riga Free Port, Krievu Island

Learn more

October 2018

The 2-nd Stage of Development of Liepaja Port Railway Infrastructure

Learn more
Load
more