Railway Tracks Displacement on the Severstaļlat JSC Open Storage Area in Brivibas Gatve 201, Riga

Project completed: October 2014

Project Description

During the construction the following works were performed:

  • Construction of crane tracks (221 m)
  • Construction of subgrade
  • Dismantling and construction of railway tracks (282 m)
  • Dismantling and installation of turnout
  • Dismantling and equipping of level crossing
  • Construction of pavement for storage area
  • Construction of drainage system