Construction of Pedestrian Tunnel under Railway Track №100 in Daugavgriva (at the corner of Birzes str. and Esplanades str., and at the corner of Birzes str. and Flotes str.), on the Territory of Riga Free Port

Project completed: December 2009

Project Description

During the construction the following works were performed:

  • Construction of tunnel (16,5 m)
  • Dismantling and construction of railway track section
  • Protection of existing cable networks
  • Installation of curbstones on street roadways
  • Laying of asphalt-concrete and large sett pavement
  • Installation of power supply and lighting
  • Relaying of water supply and sewerage systems

Customer: Authority of the Freeport of Riga

16,5 m

total length

Related projects

December 2018

Railway Construction for STREK Ltd. Terminal on the Territory of Riga Free Port, Krievu Island

Learn more

October 2018

The 2-nd Stage of Development of Liepaja Port Railway Infrastructure

Learn more

October 2018

Construction of Optic Cable Line in Riga - Skulte Section

Learn more
Load
more