Project Description
During the construction the following works were performed:
- Construction of tunnel (16,5 m)
- Dismantling and construction of railway track section
- Protection of existing cable networks
- Installation of curbstones on street roadways
- Laying of asphalt-concrete and large sett pavement
- Installation of power supply and lighting
- Relaying of water supply and sewerage systems
Customer: Freeport of Riga Authority