Project Description
During the construction the following works were performed:
- Construction of railway tracks (1636 m)
- Installation of turnouts (5 pcs.)
- Reconstruction of service level crossing
- Construction of subgrade
- Removal of water supply and sewerage systems
- Removal of power supply and communication networks
- Laying of signaling cables and installation of outdoor signaling equipment
- Equipping of turnouts with electric point heating and electric point machines
- Installation of lighting
Customer: Freeport of Ventspils Authority