Construction of Railway Connecting Track for Juras Parks - Loading Rack №4 Section (hundred-meter mark 0 – 5+50) on the Territory of Ventspils Free Port

Project completed: November 2004

Project Description

During the construction the following works were performed:

  • Construction of railway tracks (670 m)
  • Installation of turnouts (3 pcs.)
  • Construction of subgrade
  • Construction of level crossings (5 pcs)
  • Installation of electric interlocking
  • Construction of pedestrian paths
  • Equipping of turnouts with electric point heating
  • Laying of cables for railway signaling

Customer: VENCEB JSC

670 m

railway tracks

3 psc.

turnouts

Related projects

May 2019

Construction of Pedestrian Tunnel on Ogre Railway Station: Special Works

Learn more

December 2018

Railway Construction for STREK Ltd. Terminal on the Territory of Riga Free Port, Krievu Island

Learn more

October 2018

The 2-nd Stage of Development of Liepaja Port Railway Infrastructure

Learn more
Load
more