Project Description
During the construction the following works were performed:
- Construction of railway tracks (4770 m)
- Installation of turnouts (17 pcs.)
- Construction of subgrade
- Construction of level crossing (6 pcs.)
- Installation of electric interlocking
- Installation of outdoor signaling equipment
- Installation of pneumatic point cleaning system
- Reconstruction of storm-water collectors
Customer: VENCEB JSC