Project Description
During the construction the following works were performed:
- Construction of railway tracks (980 m)
- Installation of turnouts (5 pcs.)
- Construction of subgrade
- Reconstruction of water supply and sewage networks
- Installation of lighting
- Construction of drainage system
Customer: Riga Bulk Terminal Ltd.