×


Scroll down

Construction of Railway Tracks on the Territory of Ventspils Free Port

Project completed: December 2003

Project Description

During the construction the following works were performed:

  • Dismantling and construction of railway tracks (2260 m)
  • Dismantling and installation of turnouts (5 pcs.)
  • Construction of subgrade
  • Reconstruction of railway tracks for tank car loading rack

Customer: BMGS JSC

2260 m

railway tracks

5 pcs.

turnouts

Related projects

May 2022

Repairs of Alpha Ekspress Ltd. Railway Access Tracks №22 and №23 in Riga

Learn more

August 2021

Construction of Optic Cable Line in Riga - Skulte Section

Learn more

November 2020

Construction of Pedestrian Tunnel on Ogre Railway Station: Special Works

Learn more
Load
more