×


Scroll down

Construction of Railway Tracks on the Territory of Ventspils Free Port

Project completed: December 2003

Project Description

During the construction the following works were performed:

  • Dismantling and construction of railway tracks (2260 m)
  • Dismantling and installation of turnouts (5 pcs.)
  • Construction of subgrade
  • Reconstruction of railway tracks for tank car loading rack

Customer: BMGS JSC

2260 m

railway tracks

5 pcs.

turnouts

Related projects

January 2021

Reconstruction of Stacijas Street in Stende. Stage 1

Learn more

November 2020

Construction of Pedestrian Tunnel on Ogre Railway Station: Special Works

Learn more

December 2019

The 2-nd Stage of Development of Liepaja Port Railway Infrastructure

Learn more
Load
more