Construction of Rezekne II Station Reception Yard (Latvian East-West Railway Corridor)

Project completed: March 2006

Project Description

The Rezekne II Reception Yard Project (2001-2006), co-financed by EU Cohesion Fund, provided for the construction of six new receiving and departure tracks as well as the installation of modern systems of communication, power supply, lighting and environmental monitoring in the yard. To ensure the railway yard control the integrated signaling and electric interlocking system was created. The implementation of the Project contributed to the increase of capacity of Rezekne railway station regarding cargo handling and introduction of efficient technology for cargo handling, which in its turn allowed the increase of carrying capacity of the East –West railway corridor.

The Project was implemented by BMGS-Transceltnieks Full Partnership.

 

Within the frame of the project the following works were carried out:

  • Construction of railway tracks (9154 m)
  • Installation of turnouts (26 pcs.)
  • Construction of subgrade
  • Installation of power supply and lighting
  • Construction of drainage system
  • Installation of yard loudspeaker system
  • Installation of telecommunication network and cable canalization
  • Construction of office and engineering building
  • Construction of heating posts for personnel
  • Installation of ground water and air monitoring system
  • Installation of purification equipment for wastewater
  • Construction of pneumatic tube system (2500 m)

Customer: Latvian Railways SJSC

9154 m

railway tracks

26 pcs.

turnouts

Related projects

May 2019

Construction of Pedestrian Tunnel on Ogre Railway Station: Special Works

Learn more

December 2018

Railway Construction for STREK Ltd. Terminal on the Territory of Riga Free Port, Krievu Island

Learn more

October 2018

The 2-nd Stage of Development of Liepaja Port Railway Infrastructure

Learn more
Load
more