Project Description
During the construction the following works were performed:
- Construction of railway tracks (4 340 m)
- Installation of turnouts (10 pcs.)
- Construction of subgrade
- Equipping of level crossing
- Laying of railway signaling cables and installation of outdoor equipment
- Installation of optic cable network
- Erection of lighting masts (4 pcs.)
- Construction of roads
- Construction of drainage system, 1100 m long
Customer: Freeport of Riga Authority