Design and Construction of Railway Transport Branches for Senpasaule Ltd. Terminal on Kundzinsala Island, Territory of Riga Free Port

Project completed: December 2014

Project Description

During the construction the following works were performed:

  • Construction of railway tracks (4 340 m)
  • Installation of turnouts (10 pcs.)
  • Construction of subgrade
  • Equipping of level crossing
  • Laying of cables for railway signaling and installation of outdoor equipment
  • Installation of cable optic network
  • Erection of lighting masts (4 pcs.)
  • Construction of roads
  • Construction of drainage system, 1100 m long

Customer: Authority of the Freeport of Riga

4 340 m

railway tracks

10 pcs.

turnouts

Related projects

October 2018

The 2-nd Stage of Development of Liepaja Port Railway Infrastructure

Learn more

October 2018

Construction of Optic Cable Line in Riga - Skulte Section

Learn more

March 2018

The 1-st Stage of Development of Liepaja Port Railway Infrastructure

Learn more
Load
more