Development of Infrastructure on Krievu Island for Relocation of Port Activity from City Centre. Stage 1: Railway Construction

Project completed: November 2015

Project Description

Development of Infrastructure on Krievu Island for Relocation of Port Activity from City Centre Project (2010-2018), co-financed by EU Cohesion Fund, provided for the relocation of Andrejosta and Eksportosta terminals activities to Krievu Island on the territory of the Freeport of Riga, with the objective of air pollution abatement and noise level reduction due to cargo transshipment operations and creation of competitive environment for business as well.

 

Within the range of the Project the following works were performed:

  • Construction of railway tracks (12 293 m)
  • Installation of turnouts (22 pcs.)
  • Construction of subgrade
  • Installation of drainage equipment
  • Equipping of railway crossings (2 pcs.)

Customer: Skonto Būve Ltd.

12 293 m

railway tracks

22 pcs.

turnouts

Related projects

December 2018

Railway Construction for STREK Ltd. Terminal on the Territory of Riga Free Port, Krievu Island

Learn more

October 2018

The 2-nd Stage of Development of Liepaja Port Railway Infrastructure

Learn more

October 2018

Construction of Optic Cable Line in Riga - Skulte Section

Learn more
Load
more