Development of Railway Tracks for B.L.B. Baltijas Terminals JSC Oil Terminal and Additional Works on the Territory of Riga Free Port

Project completed: September 2004

Project Description

During the construction the following works were performed:

  • Dismantling and construction of railway tracks (1505 m)
  • Installation of turnouts (6 pcs.)
  • Construction of subgrade
  • Construction of level crossing of reinforced-concrete slabs
  • Construction of storm sewerage system

Customer: B.L.B. Baltijas Terminals JSC

1505 m

railway tracks

6 pcs.

turnouts