Project Description
During the construction the following works were performed:
- Dismantling and construction of railway tracks (110 m)
- Repair of inspection trolleys
- Construction of roadway asphalt and concrete pavement
- Construction of sideway steel pavement
- Waterproofing of roadway
- Erection of reinforced-concrete supporting blocks
- Installation of expansion joints
- Installation of barrier and stairs
Customer: Freeport of Riga Authority