Project Description
During the construction the following works were performed:
- Dismantling and construction of railway tracks (1962 m)
- Dismantling and installation of turnouts (2 pcs.)
- Construction of subgrade
- Installation of insulated rail joints
- Construction of level crossing pavement of rubber plates
- Construction of pedestrian paths of reinforced concrete slabs
Customer: Freeport of Riga Authority