Modernisation of Signalling System on the East - West Railway Corridor in Latvia. Stage 1. Section Tukums II – Stende. Section Tukums II – Jelgava

Project completed: June 2011

Project Description

The Modernisation of Signaling System on the East - West Railway Corridor in Latvia Project (2005-2012), co-financed by European Union, European Investment Bank and European Bank of Reconstruction and Development, provided for the design and construction of new railway signaling system, including outdoor equipment, automatic block system, high voltage electric network, interlocking and telecommunication dispatching posts to ensure reliable transition of cargo from Russia and Belarus in the direction to the Latvian ports.

 

Within the frame of the project the following works were carried out:

  • Laying of cables for railway signaling and communication (218 km)
  • Trench excavation
  • Installation of signals at level crossings
  • Installation of signaling outdoor equipment
  • Installation of cable manholes

Customers: Thales Latvia Ltd., Latvijas Energoceltnieks Ltd.

218 km

cables

Related projects

December 2018

Railway Construction for STREK Ltd. Terminal on the Territory of Riga Free Port, Krievu Island

Learn more

October 2018

The 2-nd Stage of Development of Liepaja Port Railway Infrastructure

Learn more

October 2018

Construction of Optic Cable Line in Riga - Skulte Section

Learn more
Load
more