Scroll down

Modernization of Automatic Block on Indra – State Border Section

Project completed: March 2010

Project Description

During the construction the following works were performed:

  • Laying of cables for railway signaling (61 550 m)
  • Laying of optic cable network (10 000 m)
  • Installation of signals (8 pcs.)
  • Installation of cable boxes and track boxes
  • Installation of signaling outdoor equipment

Customer: Latvian Railways SJSC

61550 m

signaling cables

10000 m

optic cables