Modernization of Signaling System and Reconstruction of Railway Tracks at Liepaja Station

Project completed: December 2015

Project Description

Modernization of Signaling System and Reconstruction of Railway Tracks at Liepaja Station Project (2014-2015), which was co-financed by EU Cohesion Fund and implemented by Thales – Fima – Transceltnieks Consortium, provided for the modernization of signaling system and reconstruction of railway tracks at the station with the objective of railway traffic safety and cargo transshipment efficiency improvement.

 

Within the range of the Project the following works were performed:

  • Construction of railway tracks (3800 m)
  • Installation of turnouts (24 pcs.)
  • Construction of subgrade
  • Installation of drainage equipment
  • Relocation of communication network
  • Reconstruction of level crossing

Customer: Latvian Railways SJSC

3800 m

railway tracks

24 pcs.

turnouts

Related projects

October 2018

The 2-nd Stage of Development of Liepaja Port Railway Infrastructure

Learn more

October 2018

Construction of Optic Cable Line in Riga - Skulte Section

Learn more

March 2018

The 1-st Stage of Development of Liepaja Port Railway Infrastructure

Learn more
Load
more