×


Scroll down

Overhaul Works of Railway Tracks № 14 and № 15, and Turnouts № 15, 17 and 20 in Kundzinsala, on the Territory of Riga Free Port

Project completed: November 2016

Project Description

During the construction the following works were performed:

  • Dismantling and construction of railway track (1528 m)
  • Construction of subgrade  
  • Dismantling and installation of turnouts (3 pcs.)
  • Installation of electric point heating

Customer: Authority of the Freeport of Riga

1528 m

railway tracks

3 pcs.

turnouts

Related projects

October 2018

The 2-nd Stage of Development of Liepaja Port Railway Infrastructure

Learn more

October 2018

Construction of Optic Cable Line in Riga - Skulte Section

Learn more

March 2018

The 1-st Stage of Development of Liepaja Port Railway Infrastructure

Learn more
Load
more