Project Description
During the construction the following works were performed:
- Dismantling and construction of railway tracks (960 m)
- Dismantling and installation of turnouts (9 pcs.)
- Construction of subgrade
- Construction of drainage system
Customer: LDZ infrastruktura Ltd.