Project Description
During the construction the following works were performed:
- Construction of railway tracks (680 m)
- Reconstruction of railway tracks (2439 m)
- Installation of turnouts (6 pcs.)
- Construction of subgrade
- Installation of wagon weighbridge
- Installation of service level crossing (6 pcs.)
- Construction of drainage system
Customer: LLC Liepajas Ostas Celtnieks LM