Project Description
During the construction the following works were performed:
- Construction of railway tracks (1120 m)
- Dismantling and installation of turnouts (12 pcs.)
- Construction of subgrade
- Construction of drainage system
- Installation of point heating system
- Installation of electric interlocking
- Laying of railway signaling cables
- Installation of the yard loudspeaker communication
Customer: TVA Resource Ltd.