Reconstruction of Broceni Railway Station due to the Construction of Access Tracks for Cement Production New Line KILN5

Project completed: February 2011

Project Description

During the construction the following works were performed:

  • Construction of railway tracks (1120 m)
  • Dismantling and installation of turnouts (12 pcs.)
  • Construction of subgrade
  • Construction of drainage system
  • Installation of point heating system
  • Installation of electric interlocking
  • Laying of cables for railway signaling
  • Installation of the yard loudspeaker communication

Customer: TVA Resource Ltd.

1120 m

railway tracks

12 pcs.

turnouts