Reconstruction of MAN-TESS Ltd. Oil Pipeline Section to Ensure Transport Infrastructure Construction on Kundzinsala Island, Required for Riga Bulk Terminal Ltd. Terminal, on the Territory of Riga Free Port

Project completed: April 2014

Project Description

During the construction the following works were performed:

  • Pile driving
  • Concrete pouring
  • Erection of pipeline poles
  • Dismantling and installation of pipelines
  • Ground works

Customer: Freeport of Riga Authority

126 m

pipeline

16 pcs.

piles