Reconstruction of Railway Access Tracks and Construction of New Railway Track №1 for Latvijas Finieris JSC in Riga, Gubernciema str. 7

Project completed: July 2008

Project Description

During the construction the following works were performed:

  • Dismantling and construction of railway tracks (1108 m)
  • Dismantling and installation of turnouts (4 pcs.)
  • Construction of subgrade
  • Erection of reinforced – concrete slabs (221 pcs.)
  • Protection of existing cable networks

Customer: KRONOSPAN Riga Ltd.

1108 m

railway tracks

4 pcs.

turnouts