Project Description
During the construction the following works were performed:
- Dismantling and construction of railway tracks (2160 m)
- Installation of turnouts (10 pcs.)
- Construction of subgrade
- Construction of level crossings (3 pcs)
- Construction of asphalt pavement
- Protection of power supply cables
Customer: Ventspils Tirdzniecibas osta JSC