×


Scroll down

Reconstruction of Railway Infrastructure within Riga Railway Network due to the Closing of Rigas Krasta Station

Project completed: December 2013

Project Description

During the construction the following works were performed:

  • Construction of railway tracks (1040 m)
  • Installation of turnouts (5 pcs.)
  • Construction of diamond crossing
  • Construction of subgrade
  • Reconstruction of relay and solid state interlocking
  • Equipping of turnouts with electric heating and electric point machines
  • Laying of cables for power supply, signaling and communication
  • Construction of cable canalization
  • Installation of lighting
  • Reconstruction of external water supply and sewerage systems

Customer: LDZ infrastruktura Ltd.

1040 m

railway tracks

5 pcs.

turnouts

Related projects

December 2018

Railway Construction for STREK Ltd. Terminal on the Territory of Riga Free Port, Krievu Island

Learn more

October 2018

The 2-nd Stage of Development of Liepaja Port Railway Infrastructure

Learn more

October 2018

Construction of Optic Cable Line in Riga - Skulte Section

Learn more
Load
more