×


Scroll down

Repairs of Ventspils Tirdzniecibas Osta JSC Railway Tracks №81, 82, 83 on the Territory of Ventspils Free Port

Project completed: December 2007

Project Description

During the construction the following works were performed:

  • Construction of railway tracks (1002 m)
  • Dismantling and installation of turnouts (2 pcs.)
  • Construction of level crossing (3 pcs.)
  • Construction of subgrade

Customer: Ventspils Tirdzniecibas Osta JSC

1002 m

railway tracks

2 pcs.

turnouts

Related projects

January 2021

Reconstruction of Stacijas Street in Stende. Stage 1

Learn more

November 2020

Construction of Pedestrian Tunnel on Ogre Railway Station: Special Works

Learn more

December 2019

The 2-nd Stage of Development of Liepaja Port Railway Infrastructure

Learn more
Load
more