Project Description
During the construction the following works were performed:
- Construction of railway tracks (1002 m)
- Dismantling and installation of turnouts (2 pcs.)
- Construction of level crossing (3 pcs.)
- Construction of subgrade
Customer: Ventspils Tirdzniecibas Osta JSC