Signaling Equipment for Pedestrian Crossing on 53,5 km of Sigulda Railway Station

Project completed: November 2016

Project Description

During the construction the following works were performed:

  • Laying of cables for signaling system (410 m)
  • Erection of signals (2 pcs.)
  • Installation of relay cabinet

Customer: Latvian Railways SJSC

410 m

signaling system

2 pcs.

signals