Project completed: March 2018

Project Description

Within the frame of "Development of the Land Access Roads to the Port of Liepaja" (2017-2019) Project, co-financed by EU Cohesion Fund, the following works were performed:

  • Construction of new railway track in the Western railway yard (501 m)
  • Reconstruction of existing railway tracks (1026 m)
  • Installation of bent switch blade turnout 
  • Replacement of turnouts (7 pcs.)
  • Construction of subgrade
  • Installation of electric point heating and electric point machines
  • Construction of cable electric network
  • Installation of lighting masts (4 pcs.)
  • Construction of water drain system
  • Reconstruction of level crossings (3 pcs.)
  • Protection of external networks of water supply and sewage

Customer: Authority of the Liepaja Special Economic Zone

1527 m

railway tracks

8 pcs.

turnouts

Related projects

May 2019

Construction of Pedestrian Tunnel on Ogre Railway Station: Special Works

Learn more

December 2018

Railway Construction for STREK Ltd. Terminal on the Territory of Riga Free Port, Krievu Island

Learn more

October 2018

The 2-nd Stage of Development of Liepaja Port Railway Infrastructure

Learn more
Load
more