Project Description
Within the frame of "Development of the Land Access Roads to the Port of Liepaja" (2017-2019) Project, co-financed by EU Cohesion Fund, the following works were performed:
- Construction of new railway track in the Western railway yard (501 m)
- Reconstruction of existing railway tracks (1026 m)
- Installation of bent switch blade turnout
- Replacement of turnouts (7 pcs.)
- Construction of subgrade
- Installation of electric point heating and electric point machines
- Construction of cable electric network
- Installation of lighting masts (4 pcs.)
- Construction of water drain system
- Reconstruction of level crossings (3 pcs.)
- Protection of external networks of water supply and sewage
Customer: Authority of the Liepaja Special Economic Zone