Project Description
Within the frame of "Development of the Land Access Roads to the Port of Liepaja" Project (2017-2019), co-financed by EU Cohesion Fund, the following works were performed:
- Construction of railway tracks (1108 m)
- Installation of turnouts (6 pcs.)
- Construction of subgrade
- Construction of water drain system (801 m)
- Construction of level crossings (5 pcs.)
- Construction of external water supply and sewage networks
- Construction of cable canalization
Customer: Fima Ltd.