The 2-nd Stage of Development of Liepaja Port Railway Infrastructure

Project completed: December 2019

Project Description

Within the frame of "Development of the Land Access Roads to the Port of Liepaja" Project (2017-2019), co-financed by EU Cohesion Fund, the following works were performed:

  • Construction of railway tracks (1108 m)
  • Installation of turnouts (6 pcs.)
  • Construction of subgrade
  • Construction of water drain system (801 m)
  • Construction of level crossings (5 pcs.)
  • Construction of external water supply and sewage networks
  • Construction of cable canalization

Customer: Fima Ltd.

1108 m

railway tracks

6 pcs.

turnouts